Get Latest Mechanical Mini Projects in your Email

Your Email ID:
Mini.in Subs

Fixture Design Criteria

Download Project:

Fields with * are mandatory

The objective of this project was to research technologies to improve and speed fixture designs within Tinker AFB. Envisioned is a Roadmap for Fixture design. One current deliverable is an electronic Fixture Design Manual.

This manual is complete with detailed descriptions of theoretical fixture design principles (a power point presentation), a detailed text, a summary of available hydraulic fixtures (as per the request of the sponsor), and animation of 7 fixtures (including 3 designed and employed currently at Tinker) in a CAD software ProEngineer.

A final report and a full cost/benefits analysis is also presented. Projected benefits of this project include improved repair processes, reduced costs, and higher reaction speeds. A Phase II is currently underway to research and analyze fixtures currently employed at Tinker in various shops and to capture and document the design EngineersÂ’ perspective.

Download Project

>> Reliability and Maintenance Projects for Final Year Students

Download Project:

Fields with * are mandatory